Launceston City Council
Mayor and Aldermen
Civic Affairs and Events
Council Meetings and Committees
Strategic Plans, Budgets and Reports
Contact Us
History of Council
Organisational Structure
News and Publications
Careers with Council
Contractors and Tenders
Town Hall Tours
By-Laws
Public Land
Petitions to Council
Freedom of Information Application
Residents' Panel
Search 
Quick Find 
Standard Drawings PDF Print E-mail

The standard drawings cover all municipal infrastructure including roads, drainage, sewer, small pump stations and water supply.

Amendments to drawings will be issued every six months.
The standard drawing files are in Autocad (dwf) format.
To view them you may need to download the free AutodeskDWF Viewer.Click here to download the AutoDesk DWF Viewer.

General Standards

DWG No. Title Current Version
Pipe Installation
G-01 Trench Reinstatement - Flexible Pavements

31-Jul- 05

G-02 Trench Excavations Limits -Adjacent to Footings 07-Sep-06
G-03 Reference Points 31-Jul-05

Road Standards

DWG No. Title Current Version
Pipe Installation

Rural Roads

DWG No. Title Current Version
R-01 Unsealed - Single Lane 31-Jul- 05
R-02 Sealed - Single Lane 31-Jul-05
R-03 Sealed - Dual Lane 31-Jul- 05
R-04 Typical Property Access 20-Apr-07

Urban Roads

DWG No. Title Current Version
R-05 Typical Section and Pavement Widths 20-Apr-07
R-06 Cul-De-Sac Turning Heads 31-Jul-05
R-08 Driveways 01-Jul-05
R-09 Footpaths 31-Jul-05
R-10 Sub Soil Drains
R-11 Construction Details 31-Jul-05
R-12 Pit Connection - Type FDKerb and Channels 31-Jul-05
R-13 Concrete Dimensions 31-Jul-05
R-14 Concrete - Construction Details 07-Sep-06
R-15 Concrete - Vehicular Crossings 20-Apr-07
R-16 Concrete - Grated Wedge Crossings 31-Jul-05
R-17 Concrete - Access Ramps 31-Jul-05
R-18 Bluestone - Construction Details 31-Jul-05
R-19 Traffic Management
R-20 Traffic Islands 08-May-07
R-21 Road Humps, Thresholds and Roundabouts 30-Mar-07
R-22 Bus Bays 11-May-07
R-23 Signs & Parking Meters 08-May-07
R-24 Line Marking - Traffic Control 31-Jul-05
R-25 Line Marking - Parking Control and Signage 08-May-07
R-26 Guide Posts 10-May-07
R-27 Delineators 15-May-07
R-28 Barriers/Guard Rails
R-29 Clear Zone Treated Pine Fence 31-Jul-05
R-30 W-Beam - Installation Details 31-Jul-05
R-31 W-Beam - Terminal Treatment 31-Jul-05
R-32 W-Beam - Approach/Departure Flares 31-Jul-05
R-33 Rigid Bollards 04-Jul-07
R-34 Lockable BollardsRetaining Walls & Stairways 04-Jul-07
R-35 Stone Walls/Rock Pitching 31-Jul-05
R-37 Stairway Construction 31-Jul-05
R-38 Pedestrian Fences 31-Jul-05
Landscaping
R-41 Nature Strip Details 31-Jul-05
R-42 Tree/Shrub Planting 31-Jul-05

Sewer and Stormwater Standards

DWG No Title Current Version
Pipe Installation
S-01 Anchor Blocks 31-Jul- 05
S-02 General Arrangements 31-Jul- 05
S-03 Benching Details 21-Oct-05
S-06 Hydraulic Capacity Curves 31-Jul-05
S-07 Grate and Frame Details 31-Jul-05
S-08 Unsealed Pit Construction 21-Oct-05
S-09 Sealed Pit Construction 31-Jul-05
S-10 1220 Lintel Details 31-Jul-05
S-11 1830 Lintel Details 31-Jul-05
S-12 Kerb Transitions 31-Jul-05
S-13 Type 'PCM' Pit Construction 31-Jul-05
S-14 Table Drain Pit Construction 31-Jul-05
S-15 Headwalls
S-16 Outlet Headwalls - 300 to 900 dia. Pipes 31-Jul-05
S-17 Outlet Headwalls - 1050 to 1350 dia Pipes 31-Jul-05
S-18 Inlet Headwalls - 300 to 900 dia Pipes 01-Jun-06
S-19 Inlet Headwalls Raised Grated Inlet
S-20 Inlet Grate and Fence Requirements 12-Oct-05
S-21 Access Ladders
S-22 General Arrangements 31-Jul-05
S-23 Retractable Stanchion 31-Jul-05
S-24 Connections
S-25 Property Connections to Mains 31-Jul-05
S-26 Saddle Connections to Sewer Mains 18-Sep-06
S-27 Repairs/New Connections to Sewer Main 31-Jul-05
S-28 Sewer Vents- 150 and 225 dia. 18-Sep-06
S-29 Gas Seal (Stainless Steel) 31-Jul-05
Sediment Control
S-30 Guidelines for Sediment Control 31-Jul-05
Pump Stations
S-32 Single User - Installation Guidelines 31-Jul-05
S-33 Dual Pump(<50 L/s) - Installation Guidelines 31-Jul-05
Small Switchboard
S-35 Single Line Diagram 25-Jan-06
S-36 240V AC Control Dol & Ess Options 31-Jul-05
S-37 240V DC Control 25-Jan-06
S-38 RTU/PLC Inputs 25-Jan-06
S-39 Front Elevations 25-Jan-06
S-40 General Arrangement 25-Jan-06

Water Reticulation Standards

DWG No. Title Current Version
Pipe Installation
W-01 Thrust Blocks 31-Jul- 05
Stop Valves/Fire Plugs
W-02 Typical Layout 31-Jul- 05
W-03 Typical Installation 31-Jul- 05
Fire Plugs
W-04 Location and Spacing 20-Jan-06
W-05 Marking - With Kerb (s) 31-Jul-05
W-06 Marking - Without Kerb (s) 31-Jul-05
W-07 Markings - at Intersections 31-Jul-05
W-08 Domestic - 20 to 25 dia 31-Jul-05
W-09 Commercial - 32 dia and larger 03-Nov-05
Rider Mains
W-13 63 O.D Polyethylene - Typical Layout 31-Jul-05
W-14 63 O.D Polyethylene - Connection Details 31-Jul-05
Flow Measurement
W-15 Pit Construction Details 31-Jul-05